Friday, October 28, 2011

Backfilling

We have almost finished backfilling (replacing the dirt that we took out during excavating). We originally thought that backfilling was going to take quite awhile. It ended up only taking 3 days! Yay for finishing something early!
We still need to rent a roller tamper (which should be coming today) to tamp the top of the living room and the garage. Once that is done we need to top both floors with a crush (sand/gravel mix) and then we have some piles (structural support) to put in and we can put the living room floor on and move ahead with framing.

The house after backfilling:



Wednesday, October 19, 2011

Main Floor Walls

While we were waiting for the issue with our foundation panels to be resolved we worked on framing in the main floor. I have good news on both the main floor walls and the foundation panels. We are finished the main floor walls and we finished putting up the rest of the foundation panels yesterday! Yay!

We had our foundation inspection this morning and we can now go ahead with the backfilling! Hopefully, if all goes well, we will be finished with backfilling early next week and then we can move onto framing the rest of the house.

Main floor walls (front of the house)
Main floor interior walls

Friday, October 14, 2011

This and That

Apparently I am a bad blogger. I don't seem to have time to write new posts lately. I guess running a business and building a house will do that to a person!

We have gotten a bit done in the last little while:

1.We have the water line and the electrical run to the house.
2.We have laid and covered the weeping tile with gravel. For anyone who doesn't know, Weeping tile is a corrugated, perforated plastic tube that runs around the perimeter of your basement. It is designed to gather any water that is in the soil around your house (from rain, etc) and take it into the sump pit (the sump pump will later pump the water out) so that the excess water doesn't just run into your basement.
2.We have attached the peel and stick water proofing to the outside of the foundation. Waterproofing is a thick plastic membrane that is plastic on the front and the back is sticky. You apply to the outside of your foundation so that any water will just run down the outside of your foundation and into the weeping tile. ( I am sure there is a more technical explanation but that's the best that I can do.)
3. The sump pit hole has been dug and the sump pit hooked up to the weeping tile.
4. The main floor trusses are all up.
5. The main floor subfloor is on.
6. Almost all of the main floor exterior walls are up. I should have some wall pictures to post in a couple of days!
7. We have resolved our foundation wall issues from my last post and should be receiving our new panels today.

Next week we are planning on having our foundation inspection and backfilling. Hopefully we should be able to see a lot of progress then. There are so many things that we just can't do until we backfill.

I don't have pictures of a lot of the stuff we have done recently (pictures of electrical wires, or gravel piles really aren't all that exciting) but here is one of the first couple of trusses we put up:

There really isn't an opening in our basement like this picture shows,
we just left a panel out so that we could get in easier.
It's all closed up now though! 

Sunday, October 2, 2011

Foundation Walls

Typically in Canada foundation walls are constructed out of an 8"concrete wall with a 2x4 wood framed wall on the inside to allow for insulation (you put the insulation in the 2x4 wall). We decided to try out a relatively new product which we thought for a little extra money would save us a bunch of time. It didn't.

As of right now we aren't overly impressed with the company so I am unsure if I want to the use their name yet or not but the product is basically pre-cut panels that are made specifically to your plans. The panels are constructed out of steel studs and styrofoam. The installation method is pretty simple (in theory), you attach a metal track to the top of your footing and then screw in the  panels to the track and then attach another track along the top of the panels and then attach a wood sill plate to the top of that track so that you can later attach your wood framed walls. The company claimed that you can install a full basement in 3 days with a crew of 3 guys with little to no construction experience. Now in the company's defence they could possibly mean a 4 sided house with 4 corners. Our house is a 5 level split with 27 corners (our foundation has 2 different levels). It took us 2-3 (at times) experienced men with some help from my mom and myself about 2 weeks to get our foundation up.

Some of this delay is due to our house plan, we will take total responsibility for this. We love our house plan and feel that it's work a few extra headaches. Some of it however is due to errors on behalf of the company. I don't want to get into in great detail but basically 10% of our order was messed up. Either the panels were not built correctly, or the were too short, or not wide enough, or they were missing all together. We notified the company that these panels were wrong. They remade the panels quickly and our sales rep delivered them himself. Great, things are going good. We go to put on the new, fixed panels, and they are still wrong. We contact the company to inform them of the new mistakes and as of right now they seem to be refusing to remake the panels to the correct size. Hopefully I will have an update on this soon.

Some pictures of our basement going up:

Panel delivery - that's a lot of styrofoam! 

First wall going up

Wall sitting in the 'track'

the 'track' on the footing